Knowledge / Aviation (B.Sc Aviation; pilot / airport operations) / Crew resource management

Crew resource management

Aviation (B.Sc Aviation; pilot / airport operations) (B.Sc Aviation) · Human factors and safety · free study notes for exams, placements and interviews

In short

Crew resource management (CRM) is the practised use of all available resources — people, equipment, procedures and information — by a crew to achieve a safe and efficient flight. It exists because most accidents are not caused by a failed engine or a lack of flying skill but by breakdowns in communication, leadership, monitoring and decision-making inside a technically normal aircraft. CRM is now a licensed and recurrent training requirement for Indian flight crew and cabin crew under DGCA Civil Aviation Requirements, with an approved CRM instructor/examiner system, and it extends to ATC, maintenance (MRM) and airport operations teams. In B.Sc Aviation programmes it is examined in human factors and safety papers, and in interviews at Air India, IndiGo, Akasa, SpiceJet, AAI, Air India SATS and ground-handling firms it is tested through situational questions ("the captain is descending below minima — what do you do?").

Explained

What CRM is, and how it evolved

The core CRM skills (the NOTECHS framework)

NOTECHS (Non-Technical Skills) is the European-origin framework used worldwide for *assessing* CRM; it has four categories, each with elements and observable behavioural markers.

Communication, briefing and the authority gradient

Decision-making, workload and the handling/monitoring split

Threat and Error Management, monitoring and automation

CRM training, assessment and Indian regulation

What CRM cannot do, and the Indian case studies

Key points

Formulas and examples

Risk index R = S × L — ICAO 5×5 matrix; S = severity (A catastrophic … E negligible, scored 5…1), L = likelihood (5 frequent … 1 extremely improbable). Dimensionless; 1–25.
d = v × t — distance flown while a decision is delayed; v in m/s, t in s, d in m. Conversion: 1 kt = 0.5144 m/s; 1 ft/min = 0.00508 m/s.
Time available t = Δh / ROD — Δh in ft, ROD (rate of descent) in ft/min, t in minutes.
Error-management rate = (errors mismanaged ÷ errors committed) × 100 % — the key LOSA output; its complement is the trap-and-mitigate rate.
Max FDP = basic FDP from the CAR table − (sector reduction × sectors beyond the allowed number); report time and the window of circadian low (roughly 02:00–05:59 body clock) reduce the basic figure. The numbers are set by the current DGCA FDTL CAR and have been revised — use the table in force, not a remembered value.
Threat/error density = total threats (or errors) observed ÷ number of flights observed — per-flight rate used to compare fleets or bases.

Example 1 — cost of a delayed go-around call. A crew is at 140 kt groundspeed on short final. The PM sees the aircraft high and fast but hesitates for 3 s before calling.

Example 2 — time the sterile cockpit actually buys. An aircraft descends from 10,000 ft to touchdown at an average 1,500 ft/min.

Example 3 — risk index for a CRM hazard (ICAO 5×5). Hazard: "first officers on the fleet do not call go-around on unstable approaches."

Example 4 — reading a LOSA report. 220 flights observed; 352 threats, 143 errors, of which 19 were mismanaged into an undesired aircraft state.

Example 5 — monitoring an altitude bust. Cleared FL090, the crew sets 9,000 ft but the PF leaves V/S at 1,800 ft/min with no level-off armed. The PM's altitude call-out is due at 1,000 ft to go.

Technical (hard) skillsCRM (non-technical) skills
What is trainedHandling, systems, proceduresCommunication, leadership, SA, decisions
How assessedTolerances (±knots, ±feet)Behavioural markers, NOTECHS ratings
Failure modeLoss of control, mis-set systemError chain unbroken, UAS not recovered
Training vehicleBase/type training, proficiency checkLOFT, joint briefings, LOSA feedback
IndiaDGCA skill test / IR renewalDGCA-approved recurrent CRM, CRMI/CRMIE
ModelStepsBest used when
DODAR/TDODARTime, Diagnose, Options, Decide, Assign, ReviewAirborne abnormal with some time
FORDECFacts, Options, Risks/benefits, Decision, Execution, CheckComplex, novel, high-consequence
RPD (pattern match)Recognise → act → checkTime-critical, memory-item events

Where it is used

Interview questions

Common mistakes

Related topics

Human performance and limitations · Aviation safety and safety management systems · Air traffic control and aerodrome operations · Airline operations and flight dispatch · Aircraft systems and cockpit automation · Emergency procedures and cabin safety.

Open in the Knowledge reader →Find jobs →