In short

Surveying is the measurement of relative positions on, above or below the earth's surface; chain surveying fixes horizontal distances, compass surveying fixes directions, and levelling fixes heights. These three form the foundation course of every civil engineering degree and are the base on which theodolite, total station and GPS work is built. They are examined heavily in GATE, state PSU and SSC-JE papers, and are used daily by site engineers, revenue/cadastral surveyors, irrigation and PWD departments, L&T, NHAI contractors and railway survey teams. All work in India is in SI units, referred to Survey of India benchmarks and mean sea level.

Explained

Principles, classification and accessories

Chain surveying - field procedure

  1. Reconnaissance and a rough index sketch; select main stations forming well-conditioned triangles (no angle less than 30° or more than 120°; 60° is ideal) so intersections are sharp.
  2. Marking stations with pegs/nails; measure the base line (longest line, on level open ground) with the greatest care - all other work is referred to it.
  3. Ranging: placing intermediate rods on the line. Direct ranging when the ends are intervisible; reciprocal (indirect) ranging by two surveyors when a hill intervenes; a line ranger (two right-angled prisms) lets one person range alone.
  4. Chaining: follower holds zero at the station, leader carries 10 arrows; one arrow is planted per chain length; distance = (chains × length) + fraction.
  5. Offsets to detail: perpendicular (short, by cross staff/optical square or 3-4-5 method) and oblique (two tie measurements to a known feature). Offsets are kept short, usually under 15 m.
  6. Check line (proof line) and tie line: a check line verifies the accuracy of a triangle; a tie line joins two points on main lines to pick up detail. Every triangle must have a check line.
  7. Obstacles: to *chaining but not ranging* (pond) - similar triangles or a rectangle; to *ranging but not chaining* (hill) - reciprocal ranging; to *both* (building) - offset a parallel line and transfer by right angles.
  8. Limits of accuracy: ordinary chaining about 1 in 1,000; good work with a steel tape 1 in 5,000 to 1 in 10,000.

Errors and corrections in chaining

Compass surveying - bearings and local attraction

Levelling - instruments and terms

Reduction, errors and contouring

Key points

Formulas and examples

True length = (L′ / L) × measured length; True area = (L′ / L)² × measured area
(L′ = actual length of the chain used, L = nominal/true length, same units)
Slope correction C = − h² / 2L (h = difference in level, L = slope length), or C = − L(1 − cos θ)
Temperature C = α (Tm − T0) L; Pull C = (P − P0)L / (AE); Sag C = − w²L³ / (24P²) per span
(α = coefficient of expansion /°C, A = cross-section mm², E = modulus N/mm², w = weight per metre, P = applied pull N)
True bearing = magnetic bearing ± declination (+ for east declination, − for west)
Latitude L = l cos θ; Departure D = l sin θ; Closing error e = √(ΣL² + ΣD²); tan θe = ΣD / ΣL
Bowditch correction to a line = total error × (length of that line / perimeter)
HI = RL of BM + BS; RL = HI − (IS or FS)
Rise/Fall = previous reading − following reading (positive = rise)
Check: ΣBS − ΣFS = ΣRise − ΣFall = last RL − first RL
Curvature Cc = 0.0785 d² m; Refraction Cr = 0.0112 d² m; Combined C = 0.0673 d² m (d in km)
Distance to visible horizon d = √(h / 0.0673) km (h in metres)
Reciprocal levelling: true difference = [(a₁ − b₁) + (a₂ − b₂)] / 2
Bubble sensitivity α″ = (S × 206265) / (n × D); Radius R = (n × D × l) / S (S = staff intercept, n = divisions run, D = distance, l = length of one division, usually 2 mm)
Trapezoidal rule: A = d[(O₁ + Oₙ)/2 + O₂ + O₃ + … + Oₙ₋₁]
Simpson's rule (odd number of offsets): A = (d/3)[(O₁ + Oₙ) + 4(even-position offsets) + 2(remaining odd-position offsets)]

1. Incorrect chain. A 20 m chain was found to be 20.08 m long during a survey. The measured length of a line was 1,500 m and the measured area of a plot 2.5 hectares.

2. Local attraction in a compass traverse.

LineObserved FBObserved BBFB − BB
AB59°00′239°00′180°00′
BC139°30′318°00′178°30′
CD215°15′36°45′178°30′

3. Levelling - both reduction methods. BS 1.455 on a BM of RL 100.000; IS 2.350; IS 0.980; FS 2.885 (change point); BS 1.250; IS 1.775; FS 2.045.

StationBSISFSHIRLRiseFall
BM1.455101.455100.000
22.35099.1050.895
30.980100.4751.370
CP1.2502.88599.82098.5701.905
51.77598.0450.525
62.04597.7750.270

4. Curvature, refraction and reciprocal levelling.

5. Area from offsets. Offsets of 2.5, 3.8, 4.6, 5.2, 4.9, 4.0, 3.1 m taken at 10 m intervals along a chain line.

Chain surveyingCompass surveyingLevelling
MeasuresHorizontal distancesHorizontal directions (bearings)Differences in elevation
Main instrumentChain/tape, cross staffPrismatic or surveyor's compassAuto/dumpy level and staff
Typical accuracy1 in 1,000 to 1 in 5,000±15′ to ±30′ in bearingA few mm per km (ordinary)
Main limitationOnly small, open, fairly level areasLocal attraction, no vertical anglesNeeds intervisibility, slow over long lines
Chief checkCheck lines and tie linesFB − BB = 180°, closing errorΣBS − ΣFS = last RL − first RL

Where it is used

Interview questions

Common mistakes

Related topics

Theodolite, total station and GPS · Curves and setting out · Photogrammetry and drone surveys · GIS and remote sensing · Earthwork volumes and mass haul · Building construction and site layout

Open in the Knowledge reader →Find jobs →