Mineral economics and reserve estimation

Mining Engineering (B.E./B.Tech) · Geology and economics · free study notes for exams, placements and interviews

In short

Mineral economics studies how an exhaustible, fixed-location, grade-variable natural asset is valued, taxed and brought to production; reserve estimation is the quantitative step that converts borehole and sampling data into tonnage and grade, and then into the part of it that can be mined at a profit. Every mining decision — lease bid, plant capacity, pit limit, mine life — rests on these two. In India the statutory frame is the MMDR Act, 1957 (as amended, notably 2015, 2021, 2023 and 2025), the Mineral Conservation and Development Rules, 2017, the Mineral (Evidence of Mineral Contents) Rules, 2015 and UNFC classification maintained by IBM and GSI. It carries heavy weight in GATE (Mining Engineering), university papers on mine economics and mine planning, and in interviews at Coal India, NMDC, Hindustan Zinc, Tata Steel, Vedanta, JSW, Hindalco, GSI, IBM and mining consultancies.

Explained

Why minerals are an economic special case

Demand, supply, price and the value chain

Resources and reserves: classification

Reserve estimation: conventional methods

Common steps for all methods: 1) compile and validate assay/drill data, 2) build geological boundaries and apply a cut-off, 3) composite samples to equal lengths, 4) treat outliers (top-cut), 5) compute volume, 6) convert to tonnes using bulk density, 7) compute tonnage-weighted average grade, 8) apply dilution and recovery, 9) classify by data density.

Geostatistical estimation

Cut-off grade, dilution and modifying factors

Project appraisal, valuation and the Indian fiscal frame

Key points

Formulas and examples

Tonnage T = V × ρ — V = in-situ volume (m³), ρ = in-situ bulk density (t/m³)
Tonnage factor TF = 1/ρ (m³ per tonne)
Weighted average grade ḡ = Σ(Tᵢ gᵢ)/ΣTᵢ (or Σ(aᵢ tᵢ gᵢ)/Σ(aᵢ tᵢ) for area aᵢ, thickness tᵢ)
Triangle volume V = A × (t₁+t₂+t₃)/3 ; Polygon volume V = Σ Aᵢ tᵢ
Average end area V = L(A₁+A₂)/2 ; Prismoidal V = (L/6)(A₁+4A_m+A₂) ; Cone/Smith V = (L/3)(A₁+A₂+√(A₁A₂))
IDW estimate g* = Σ(gᵢ/dᵢⁿ) / Σ(1/dᵢⁿ) — dᵢ = distance of sample i, n = power (2 typical)
Semi-variogram γ(h) = (1/2N(h)) Σ [g(x)−g(x+h)]² ; spherical model γ(h)=C₀+C[1.5(h/a)−0.5(h/a)³] for h≤a, = C₀+C for h>a
Break-even cut-off grade g_c = C / (P × R × k) — C = cost per tonne ore (Rs/t), P = metal price (Rs/kg), R = recovery (fraction), k = kg of metal per tonne per unit grade (10 kg/t per 1%)
Stripping ratio SR = waste tonnes / ore tonnes ; Break-even SR = (Value_ore − Cost_ore)/Cost_waste (per tonne of ore)
Diluted grade g_d = (T_o g_o + T_w g_w)/(T_o + T_w) ; dilution % = T_w/T_o × 100
NPV = Σ CFt/(1+i)t − C₀ ; IRR is i at NPV = 0 ; Payback = C₀ / annual CF (undiscounted)
Annuity present value factor = [1 − (1+i)−n]/i
Taylor's rule: life (years) ≈ 6.5 × (reserve in million tonnes)0.25 ; R/P ratio = reserves / annual production
Royalty (ad valorem) = rate × ASP × tonnes dispatched ; DMF = prescribed % of royalty ; NMET = 2% of royalty

Example 1 — triangle method, tonnage and weighted grade. Three bauxite boreholes form a triangle of plan area 12,000 m² with ore thicknesses 6, 8 and 10 m and Al₂O₃ grades 48%, 45% and 42%. In-situ bulk density 2.4 t/m³.

Example 2 — cross-section volume, three rules. Two parallel sections 50 m apart show ore areas A₁ = 2,500 m², A₂ = 3,100 m²; mid-section area A_m = 2,800 m². Iron ore density 3.9 t/m³.

Example 3 — IDW block grade and the effect of power n. Four holes around a block: grades 1.20, 0.80, 1.50, 1.00% Cu at 50, 80, 120, 150 m.

Example 4 — cut-off grade and pit limit. Copper ore: mining + processing + G&A = Rs 1,600 per tonne of ore; Cu price Rs 750/kg; mill recovery 85%; waste mining Rs 120/t.

Example 5 — DCF appraisal and mine life. Reserve 25 Mt; capex Rs 500 crore at t = 0; net annual cash flow Rs 120 crore for 8 years; discount rate 12%.

Example 6 — statutory costs per tonne. Iron ore lumps, ASP Rs 4,500/t, royalty 15% ad valorem, pre-auction lease (DMF at 30% of royalty), NMET 2% of royalty.

MethodData neededGives error estimateBest suited to
Polygon (included area)Thickness + grade per holeNoFlat, uniform, regular grid
TriangleThree-hole groupsNoModerately variable thickness
Cross-sectionParallel sectionsNoOpen pits, bedded coal/iron ore
Isopach/contourThickness or grade contoursNoFlat bauxite, laterite, seams
IDWComposited samples + distancesNoQuick models, moderate continuity
Ordinary krigingVariogram + compositesYesFeasibility-grade resource models
Conditional simulationVariogram + compositesYes (full distribution)Risk and grade-uncertainty studies

Where it is used

Interview questions

Common mistakes