In short
Community development is a planned process by which people in a locality, with professional help, identify their own felt needs, organise themselves and act collectively to improve their social and economic conditions using their own and external resources. In Indian social work it is the operational field in which the community organisation method is applied, across three distinct settings — rural (village/panchayat), urban (slum/ward) and tribal (Scheduled Area/forest-dependent) — each with its own law, administrative machinery and problems. It carries heavy weight in MSW university papers (Fields of Practice, Community Organisation, Rural/Urban/Tribal Development papers) and in UGC-NET Social Work. Employers test it in interviews for CSR, NGO project officer, livelihood/SHG coordinator, NRLM–NULM cadre, block/district programme manager and research roles with organisations such as PRADAN, SEWA, BAIF, Aga Khan Rural Support Programme, SPARC, Tata Trusts, Azim Premji Foundation and state rural livelihood missions.
Explained
Concept, principles and history
- Definition (UN, 1955, still the exam-standard one): a process in which people of a community join with governmental authorities to improve the economic, social and cultural conditions of the community, integrate it into national life and enable it to contribute fully to national progress. Two elements: people's participation with their own initiative, and technical/other services from outside.
- Community development vs community organisation: development is the *programme/goal* (change in living conditions); organisation is the *social work method* (Murray Ross: people identify needs, order them, find resources, act, and develop cooperative attitudes). CD is a field; CO is the professional method used in it.
- Core principles: felt needs as the starting point; self-help and self-reliance; participation and democratic decision-making; use of indigenous leadership; starting where the people are; multi-sector (holistic) programmes; non-imposition; working through existing institutions (Gram Sabha, SHG, ward committee); sustainability and withdrawal/handover.
- Approaches: (a) welfare/service — delivering benefits; (b) technical assistance/extension — expertise and inputs; (c) self-help — mobilising local effort; (d) conflict/structural approach (Saul Alinsky, Paulo Freire's conscientisation) — challenging unjust power; (e) rights-based entitlement approach — claiming legal rights (now dominant in Indian practice).
- Indian history, in sequence: Sriniketan (Tagore, 1908), Marthandam (Spencer Hatch, YMCA, 1921), Gurgaon Experiment (F.L. Brayne, 1920), Sevagram and Gandhi's Nai Talim/village swaraj, Firka Development Scheme (Madras, 1946), Etawah Pilot Project (Albert Mayer, 1948) — direct parent of the national programme, Nilokheri (S.K. Dey).
- Community Development Programme, 2 October 1952 — 55 pilot projects (each covering about 300 villages, grouped into three blocks), Block Development Officer with multi-purpose Village Level Workers; National Extension Service, 1953. Judged to have faltered on real participation, which produced the Balwantrai Mehta Committee (1957) recommendation of democratic decentralisation (three-tier panchayati raj: village–block–district), implemented first in Rajasthan (Nagaur, 2 October 1959), then Andhra Pradesh. Ashok Mehta Committee (1978) proposed two tiers (zilla parishad and mandal panchayat); L.M. Singhvi Committee (1986) urged constitutional status; G.V.K. Rao Committee (1985) on district-level planning.
Rural community development
- Constitutional base: Article 40 (DPSP) — state shall organise village panchayats; 73rd Amendment, 1992 (in force 24 April 1993) — Part IX, Eleventh Schedule's 29 subjects, three tiers above 20 lakh population, five-year terms, State Election Commission, State Finance Commission every five years, reservation for SC/ST in proportion to population and not less than one-third seats for women (most states, including Bihar, Maharashtra, Rajasthan, Kerala, Odisha, Karnataka and Andhra Pradesh, have legislated 50%).
- Gram Sabha (Art. 243A) — all registered voters of a village; the only direct-democracy body; approves plans and beneficiary lists, conducts social audit. A social worker's primary entry point.
- Machinery: Ministry of Rural Development and Ministry of Panchayati Raj at the Centre; District Rural Development Agency / Zilla Parishad; Block Development Officer; Gram Panchayat Secretary/VDO; frontline workers — ASHA, Anganwadi Worker (ICDS), ANM, Krishi Sakhi, Bank Sakhi, Community Resource Person.
- Major current programmes: VB-G RAM G Act — Viksit Bharat Guarantee for Rural Employment, which replaced MGNREGA from 1 July 2026, with a guarantee of 125 days of wage employment per rural household per year (the earlier guarantee was 100 days); NRLM/DAY-NRLM (Aajeevika) — SHG federations, Lakhpati Didi target; PMAY-Gramin; Jal Jeevan Mission; Swachh Bharat Mission-Gramin (now under the Solid Waste Management Rules, 2026 for waste); PM Gram Sadak Yojana; National Social Assistance Programme pensions; Mission Antyodaya gap-filling and the Gram Panchayat Development Plan (GPDP) through the People's Plan Campaign.
- Rural problems examined: landlessness and tenancy, caste and untouchability, distress migration, agrarian indebtedness, water scarcity, poor health infrastructure, school dropout, child marriage, alcoholism, panchayat capture by elites and "sarpanch-pati" proxy rule.
Urban community development
- Nature of the setting: heterogeneity, anonymity, high density, tenure insecurity, informal livelihoods, migrant populations, absence of a natural "community" — so the worker must *build* the group (basti committee, Mahila Mandal, area resource centre) rather than find it.
- History: Delhi Urban Community Development Project (1958, Ford Foundation supported) — the first systematic UCD experiment; later Hyderabad UCD and the Urban Basic Services for the Poor programme.
- Current programmes: DAY-NULM (Deendayal Antyodaya Yojana–National Urban Livelihoods Mission) with its five components — Social Mobilisation and Institution Development (SHGs, Area Level Federations), Employment through Skill Training and Placement, Self-Employment Programme (subsidised credit), Support to Urban Street Vendors, and Shelters for Urban Homeless; PMAY-Urban (now PMAY-U 2.0) with its verticals — beneficiary-led construction, affordable housing in partnership, affordable rental housing and the interest subsidy scheme (in-situ slum redevelopment was a vertical of the earlier PMAY-U); AMRUT; Smart Cities Mission; National Urban Health Mission; PM SVANidhi micro-credit for street vendors.
- Legal handles: 74th Amendment, 1992 — Part IXA, Twelfth Schedule (18 subjects), municipal corporations/councils/nagar panchayats, Ward Committees (Art. 243S) and in many states Area Sabhas; Street Vendors (Protection of Livelihood and Regulation of Street Vending) Act, 2014 — Town Vending Committee with at least 40% vendor members; Rights of Persons with Disabilities Act, 2016 for accessible public spaces; state slum improvement/clearance Acts for notified slums and eviction procedure.
- Problems examined: eviction and resettlement to city peripheries, loss of livelihood on relocation, water and sanitation (community toilets), solid waste and the safai karamchari/waste-picker question, manual scavenging (prohibited by the Prohibition of Employment as Manual Scavengers and their Rehabilitation Act, 2013), homelessness, child labour, substance use and urban crime.
Tribal community development
- Scale and categories: Scheduled Tribes are about 8.6% of the population (Census 2011; 10.45 crore), 705 notified STs; 75 Particularly Vulnerable Tribal Groups (PVTGs) identified on criteria of pre-agricultural technology, low literacy, stagnant or declining population and geographical isolation.
- Constitutional provisions: Art. 342 (notification of STs), 15(4) and 16(4) (reservation), 46 (promotion of interests), 164 (Tribal Welfare Minister in specified states), 244 with the Fifth Schedule (Scheduled Areas in ten states — Governor's power to modify laws, Tribes Advisory Council) and the Sixth Schedule (Autonomous District Councils in Assam, Meghalaya, Tripura, Mizoram), 275(1) grants, 330/332 reserved seats, 338A National Commission for Scheduled Tribes.
- PESA Act, 1996 (Provisions of the Panchayats (Extension to the Scheduled Areas) Act) — extends Part IX to Fifth Schedule areas with the Gram Sabha as the competent authority: mandatory consultation before land acquisition and resettlement, management of minor water bodies and minor forest produce, control over minor minerals, prevention of land alienation and restoration, regulation of intoxicants, control of local plans and institutions, and certification of beneficiary selection.
- Forest Rights Act, 2006 (Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act) — individual forest rights (self-cultivated land, up to 4 hectares), community forest rights and community forest resource rights, habitat rights for PVTGs, and the right of the Gram Sabha to consent before diversion of forest land; process runs Gram Sabha → Forest Rights Committee → Sub-Divisional Level Committee → District Level Committee.
- Protective law: state land transfer regulations (e.g. AP Scheduled Areas Land Transfer Regulation), Samatha judgment (1997) on mining in Scheduled Areas; the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (consent and Social Impact Assessment requirements, Gram Sabha consent in Scheduled Areas); SC/ST (Prevention of Atrocities) Act, 1989.
- Programmes: Ministry of Tribal Affairs; Tribal Sub-Plan, now Development Action Plan for Scheduled Tribes (DAPST) across ministries; Article 275(1) grants; Eklavya Model Residential Schools (EMRS); TRIFED and the Van Dhan Vikas Kendras; Minimum Support Price for Minor Forest Produce scheme; PM-JANMAN for PVTGs; Dharti Aaba Janbhagidari Abhiyan for tribal village saturation; scholarships (pre- and post-matric); state Integrated Tribal Development Agencies/Projects.
- Problems examined: displacement by dams, mines and sanctuaries (tribals form a disproportionate share of project-displaced persons), land alienation, indebtedness to moneylenders, shifting cultivation restrictions, sickle-cell anaemia and malnutrition, loss of language, forced relocation from tiger reserves, left-wing extremism and the civil-liberties cost, and inappropriate "mainstreaming".
Process, skills and tools of practice
- Steps of community organisation (exam sequence): entry and rapport building → study/survey and community profiling → identification and prioritising of felt needs → identification and development of local leadership → formation of a people's organisation (SHG/CBO/committee) → planning (objectives, activities, resources, timeline) → mobilisation of internal and external resources → implementation → monitoring and evaluation → withdrawal/phasing out with handover to the local body.
- PRA/PLA tools: social map, resource map, transect walk, seasonality calendar, daily activity chart, Venn/chapati diagram of institutions, timeline and trend analysis, wealth/well-being ranking, matrix and pair-wise ranking, mobility map, focus group discussion. PRA is "they do it" (people analyse and own the data); RRA is extraction by outsiders for the outsider.
- Project cycle instruments: Logical Framework (goal–purpose–outputs–activities with indicators, Means of Verification and assumptions), Theory of Change, baseline/endline, Social Return on Investment, participatory monitoring, social audit (statutory in VB-G RAM G/erstwhile MGNREGA and NRLM, conducted through Gram Sabha and Social Audit Units) and the Right to Information Act, 2005.
- Roles of the community worker: enabler, guide, resource person, broker/linker, advocate, mediator, educator, catalyst, organiser and recorder.
- Funding and compliance a project officer must know: CSR under section 135 of the Companies Act, 2013 (2% of average net profit of three preceding years for companies meeting the turnover/net worth/profit thresholds), CSR-1 registration on the MCA portal for implementing agencies, Schedule VII permissible activities; FCRA 2010 registration/prior permission with the designated SBI New Delhi Main Branch account for foreign contribution; registration of an NGO as a trust, society (Societies Registration Act, 1860) or section 8 company; income-tax registration and approval for donor deduction under the Income-tax Act, 2025 (the former 12A/80G provisions — quote the provision by name unless the new numbering is certain).
Comparison, advantages and limitations
- Advantages: uses local knowledge and unpaid local effort, so cost per beneficiary is low; builds institutions that outlive the project; improves targeting and reduces leakage through Gram Sabha verification and social audit; raises the bargaining power of the poor; sustainable because maintenance is owned locally.
- Limitations: slow; vulnerable to elite capture and dominant-caste/dominant-gender control; "participation" often reduced to attendance (Arnstein's ladder — manipulation and tokenism are not participation); donor-driven targets distort felt needs; measurement of empowerment is contested; staff turnover breaks trust; benefits can be captured by the better-off within the poor.
- Common critiques to cite: Gandhian (village self-reliance) vs Nehruvian (planned industrial) models; Ambedkar's rejection of the idealised village as a "sink of localism, a den of ignorance, narrow-mindedness and communalism" — important counterpoint in tribal/Dalit community work; Amartya Sen's capability approach; Robert Chambers on reversal of learning; Freire on dialogue vs banking education.
Key points
- Community development — planned, people-participatory improvement of a locality's conditions, combining self-help with outside technical aid (UN, 1955).
- Community organisation — the social work *method* used in CD; Murray Ross's definition and steps are the standard exam answer.
- Etawah Pilot Project (1948) — Albert Mayer's experiment that preceded the national CDP launched on 2 October 1952 with 55 projects.
- Balwantrai Mehta Committee 1957 — diagnosed failure of participation; recommended three-tier panchayati raj; first launched in Rajasthan on 2 October 1959.
- 73rd Amendment 1992 — Part IX, 29 subjects in the Eleventh Schedule, Gram Sabha, five-year term, one-third minimum seats for women (50% in many states).
- 74th Amendment 1992 — Part IXA, Twelfth Schedule's 18 subjects, urban local bodies, Ward Committees — the legal base of urban CD.
- PESA 1996 — makes the Gram Sabha competent in Fifth Schedule areas over minor forest produce, minor minerals, land alienation and consultation before acquisition.
- Forest Rights Act 2006 — individual rights up to 4 ha, community forest resource rights, PVTG habitat rights, Gram Sabha consent for forest diversion.
- Fifth vs Sixth Schedule — Fifth: Scheduled Areas, Governor and Tribes Advisory Council (ten states); Sixth: Autonomous District Councils in Assam, Meghalaya, Tripura, Mizoram.
- PVTGs — 75 groups identified by pre-agricultural technology, low literacy, stagnant population and isolation; targeted by PM-JANMAN.
- VB-G RAM G Act — replaced MGNREGA from 1 July 2026; 125 days of guaranteed rural wage employment per household per year; social audit through Gram Sabha.
- DAY-NULM — urban mission with five components: social mobilisation, skill training and placement, self-employment, street vendor support, shelters for the homeless.
- Street Vendors Act 2014 — Town Vending Committee with at least 40% vendor members; survey and vending certificates before eviction.
- PRA — participatory tools (social map, transect walk, wealth ranking, seasonality calendar) where the community, not the researcher, analyses.
- Elite capture — the chief failure mode of participatory programmes; countered by separate women's/SC-ST groups, open Gram Sabha and social audit.
- Withdrawal phase — a CD project is complete only when the CBO/panchayat can run the activity without the agency; planned handover, not abrupt exit.
- CSR section 135, Companies Act 2013 — 2% of average net profit of the three preceding financial years; CSR-1 registration for implementing NGOs; Schedule VII activities.
- Rights-based practice — entitlements under RTI 2005, RTE 2009, NFSA 2013, FRA 2006 and the rural employment guarantee are claimed, not requested.
Formulas and examples
Repayment rate (%) = (amount repaid on time ÷ amount due) × 100.
SHG interest, flat/simple method: Interest = P × r × t, where P = principal (₹), r = monthly rate (decimal), t = months. Reducing-balance interest is charged on the outstanding each month, so the effective cost is lower than a flat rate of the same number.
Per capita project cost = total project outlay (₹) ÷ number of direct beneficiaries.
Cost–benefit ratio = present value of benefits ÷ present value of costs; viable if > 1.
Household poverty/vulnerability indicators: deprivation score from the Socio-Economic and Caste Census; Multidimensional Poverty Index headcount ratio H = (poor persons ÷ total persons) × 100, and MPI = H × A, where A = average intensity (share of weighted indicators in which the poor are deprived).
Wage entitlement under the rural employment guarantee = days worked × notified state wage rate (₹/day), subject to the statutory maximum days per household per year (125 under the VB-G RAM G Act).
Example 1 — SHG corpus and internal lending. A Self Help Group has 12 members saving ₹100 per month for 24 months, and receives a revolving fund of ₹15,000.
- Thrift collected = 12 × 100 × 24 = ₹28,800.
- With the revolving fund: 28,800 + 15,000 = ₹43,800 available for internal lending.
- If ₹30,000 is lent to members at 2% per month flat for 10 months: interest = 30,000 × 0.02 × 10 = ₹6,000, which returns to the group as income.
- Corpus at end of the cycle = 43,800 + 6,000 = ₹49,800 (ignoring any default and expenses). A 2% monthly flat rate is 24% per annum — far cheaper than typical moneylender rates, and the reason groups still lend internally after bank linkage.
Example 2 — Wage employment entitlement. A household in a state where the notified rural employment-guarantee wage is ₹250 per day works 90 days in the year.
- Earnings = 90 × 250 = ₹22,500.
- Remaining entitlement = 125 − 90 = 35 days, worth 35 × 250 = ₹8,750 if demanded.
- If wages are paid 45 days after closure of the muster, delay compensation at 0.05% of wages per day of delay beyond 15 days applies for 30 days: 22,500 × 0.0005 × 30 = ₹337.50. (The delay-compensation rate is a scheme/rule provision and should be checked against the current operational guidelines before quoting in the field.)
Example 3 — Per capita cost and cost–benefit of a watershed project. Outlay ₹80,00,000 over a 400-hectare micro-watershed covering 500 households (2,400 persons).
- Per household cost = 80,00,000 ÷ 500 = ₹16,000; per capita = 80,00,000 ÷ 2,400 ≈ ₹3,333; per hectare = 80,00,000 ÷ 400 = ₹20,000.
- If the annual incremental benefit is ₹18,00,000 and annual operation and maintenance is ₹2,00,000, net annual benefit = ₹16,00,000 → simple payback = 80,00,000 ÷ 16,00,000 = 5 years.
- Treating the stream as a 20-year perpetuity-like flow discounted at 10%, present value ≈ 16,00,000 × 8.514 (annuity factor for 20 years at 10%) ≈ ₹1,36,22,400 → B/C ratio ≈ 1,36,22,400 ÷ 80,00,000 ≈ 1.70, so the project is economically viable.
Example 4 — Deprivation targeting in a Gram Panchayat. A panchayat has 600 households; the SECC lists 384 as deprived on at least one parameter.
- Deprivation headcount = 384 ÷ 600 = 64%.
- If the deprived households are deprived in, on average, 3 of 7 weighted indicators, intensity A = 3 ÷ 7 ≈ 0.4286, and the MPI-style index = 0.64 × 0.4286 ≈ 0.274.
- Interpretation for a GPDP: the panchayat should plan against the specific indicators driving the intensity (say housing and sanitation), not against the headcount alone.
Example 5 — Forest rights claim area. A Gram Sabha receives 150 individual forest-rights claims averaging 1.2 ha, and one community forest resource claim of 420 ha.
- Individual area claimed = 150 × 1.2 = 180 ha; total claimed = 180 + 420 = 600 ha.
- No individual claim may exceed the statutory 4 ha ceiling, so any claim above it must be trimmed at the Forest Rights Committee stage before the SDLC.
- If the SDLC rejects 20 individual claims, the claimants have a right of appeal to the District Level Committee — a rejection without a reasoned order and a hearing is a standard ground for appeal, and assisting that appeal is social work practice.
| Dimension | Rural | Urban | Tribal |
|---|---|---|---|
| Unit of work | Village, Gram Panchayat | Slum/basti, ward | Hamlet, Scheduled Area, forest village |
| Legal base | 73rd Amendment, Part IX | 74th Amendment, Part IXA | Fifth/Sixth Schedule, PESA 1996, FRA 2006 |
| Key body | Gram Sabha, Gram Panchayat | Ward Committee, Area Sabha, ULB | Gram Sabha (competent under PESA), Autonomous District Council |
| Flagship programmes | VB-G RAM G, DAY-NRLM, PMAY-G, Jal Jeevan Mission | DAY-NULM, PMAY-U, AMRUT, PM SVANidhi | DAPST, EMRS, Van Dhan, PM-JANMAN, MSP for MFP |
| Dominant problems | Landlessness, migration, agrarian distress | Tenure insecurity, eviction, informal work | Displacement, land alienation, forest access |
| Community character | Relatively homogeneous, kin-based | Heterogeneous, migrant, anonymous | Culturally distinct, often geographically isolated |
| Typical CBO | SHG, farmer group, Village Development Committee | Area Level Federation, basti committee, vendor union | Van Suraksha Samiti, FRC, tribal mahila mandal |
| Worker's first task | Rapport via Gram Sabha and frontline workers | Build a group where none exists; secure tenure data | Learn language and custom; establish trust before any plan |
Where it is used
- Rural livelihood NGOs and missions: PRADAN, BAIF, AKRSP(I), Seva Mandir, state rural livelihood missions — roles as Community Coordinator, Cluster Coordinator, Block/District Programme Manager on SHG promotion, agriculture-based livelihoods and GPDP support.
- Urban practice: DAY-NULM City Mission Management Units, SPARC and Mahila Milan in Mumbai, SEWA in Ahmedabad, Hasiru Dala with waste pickers in Bengaluru, Youth for Unity and Voluntary Action — slum sanitation, vendor certification, shelters, resettlement rehabilitation.
- Tribal practice: Integrated Tribal Development Agencies, EMRS, Vanvasi Kalyan organisations, Ekjut and SEARCH (Gadchiroli) on tribal health, Vasundhara and Kalpavriksh on FRA claim support, Van Dhan Kendras with TRIFED.
- CSR and foundations: Tata Trusts, Azim Premji Foundation, Reliance Foundation, HDFC Parivartan, Ambuja Cement Foundation — Programme Officer and Monitoring and Evaluation roles, compliance with Companies Act section 135 and Schedule VII.
- Government and quasi-government: National Institute of Rural Development and Panchayati Raj (NIRDPR), District Rural Development Agencies, District Child Protection Units, Social Audit Units, State Institutes of Rural Development; UNICEF/UNDP/ILO field positions.
- Research and teaching: TISS Rural Campus Tuljapur, NIRDPR, Institute of Rural Management Anand and university departments — baseline surveys, impact evaluation, participatory research.
Interview questions
- Q: How is community development different from community organisation? A: Community development is the field and the goal — improving a locality's conditions; community organisation is the social work method of helping people identify needs, order them, find resources and act collectively.
- Q: Why is the Etawah project important in the history of Indian community development? A: Albert Mayer's 1948 pilot in Etawah demonstrated multi-purpose village-level extension work and became the model for the Community Development Programme launched on 2 October 1952.
- Q: What did the Balwantrai Mehta Committee conclude? A: That the CDP lacked genuine popular participation, and that democratic decentralisation through a three-tier panchayati raj system with devolved funds, functions and functionaries was needed.
- Q: What makes PESA different from the ordinary 73rd Amendment framework? A: In Fifth Schedule areas PESA makes the Gram Sabha — not the panchayat — the competent authority over minor forest produce, minor minerals, land alienation, intoxicants and consultation before acquisition or resettlement.
- Q: A Gram Sabha has refused consent for diversion of forest land. Where does that power come from? A: From the Forest Rights Act, 2006, read with the Forest (Conservation) framework, which requires recognition of forest rights and Gram Sabha consent before forest land is diverted.
- Q: Urban slums are said to have "no community". How do you organise there? A: You build one — start from a shared, concrete grievance such as water or tenure, form small lane-level groups, federate them into an Area Level Federation, and link them to the Ward Committee and NULM structures.
- Q: What is elite capture and how would you detect it in an SHG programme? A: Benefits flowing to the locally powerful; detect it by checking who holds office across groups, whose names recur on loan and beneficiary lists, attendance records of poorer and SC/ST members, and by speaking to non-members separately.
- Q: Which participation is real on Arnstein's ladder? A: Only the upper rungs — partnership, delegated power and citizen control; information, consultation and placation are degrees of tokenism and attendance alone is not participation.
- Q: Name the statutory entitlements you would use in a rights-based rural intervention. A: The rural employment guarantee under the VB-G RAM G Act, RTI 2005, RTE 2009, NFSA 2013 food entitlements, FRA 2006 forest rights and pensions under the National Social Assistance Programme.
- Q: How do you plan the exit from a community project? A: From the start: build a CBO with its own accounts and leadership, transfer assets and records to the panchayat or federation, reduce staff presence in stages, and keep a light mentoring role rather than an abrupt withdrawal.
- Q: Tribal "mainstreaming" is often criticised. Why? A: Because it typically means imposing outside culture, land relations and livelihoods on a distinct society; Indian policy formally favours integration with respect for tribal culture rather than assimilation.
- Q: What compliance should an NGO project officer know before accepting funds? A: CSR funds require the company to meet section 135 thresholds, the activity to fall in Schedule VII and the NGO to hold CSR-1 registration; foreign contributions require FCRA registration or prior permission and the designated SBI New Delhi account.
Common mistakes
- Treating community development and community organisation as the same thing, or naming the UN definition without its two elements (people's initiative plus outside technical help).
- Quoting MGNREGA and 100 days as the current law — the VB-G RAM G Act replaced it from 1 July 2026 with a 125-day guarantee.
- Confusing the Fifth and Sixth Schedules, or saying PESA applies to Sixth Schedule areas; also confusing the 73rd (rural) and 74th (urban) Amendments.
- Saying the panchayat, rather than the Gram Sabha, is the consenting authority under PESA and the FRA.
- Treating a survey or a village meeting as participation, and skipping the identification of local leadership and the withdrawal plan in a written project answer.
- Copying a rural CD model into a slum, ignoring tenure insecurity, heterogeneity and the absence of a pre-existing community.
- In numericals, mixing flat and reducing-balance interest for SHG lending, or giving a per capita cost without stating the denominator (households versus persons).
Related topics
- Community organisation as a method of social work · Social welfare administration and project planning · Labour welfare and industrial social work · Social legislation and human rights in India · Rural sociology and tribal studies · Social work research and programme evaluation.