Knowledge / Petroleum Engineering / Drilling engineering

Drilling engineering

Petroleum Engineering (B.E./B.Tech) · Drilling · free study notes for exams, placements and interviews

In short

Drilling engineering is the design and execution of a borehole from surface to a target reservoir: selecting the rig, bits and drill string, designing the hydraulics, the casing scheme and the well programme, controlling formation pressure, steering the hole to a geological target, and doing all of it at the lowest safe cost per metre. It is the highest-capital activity in upstream oil and gas — an onshore rig day costs several lakh rupees and an offshore day crore-scale — so every design choice is also an economic one. In Indian universities it is a core paper in B.Tech Petroleum Engineering (IIT(ISM) Dhanbad, PDEU Gandhinagar, UPES, MIT Manipal, Anna University) and a large share of the GATE PE syllabus (Oilwell drilling, Petroleum production). Interviewers at ONGC, Oil India, Vedanta Cairn, Reliance E&P, Halliburton, Schlumberger, Baker Hughes, Weatherford, Jindal Drilling, Deep Industries and Aban Offshore probe it in every technical round, usually starting with hydrostatic pressure and a kill sheet. This note covers the engineering of the hole itself; mud chemistry and completion equipment are separate topics.

Explained

The rotary drilling rig and its five systems

Drill string, bits and the bottom-hole assembly

Drilling hydraulics, ROP and energy

Pore pressure, casing design and cementing

Well control: kicks, BOPs and kill methods

Directional, horizontal and deviated drilling

Drilling problems, costs and the Indian regulatory frame

Key points

Formulas and examples

Hydrostatic pressure: P (bar) = 0.0981 × ρ (g/cm³) × TVD (m); pressure gradient (bar/m) = 0.0981 × ρ
Buoyancy factor: BF = 1 − ρm/ρsteel ; Buoyed string weight = air weight × BF
Hook load: HL = (buoyed string weight − WOB) + travelling block weight
Fast-line pull: Ff = HL/(n × E), n = lines strung, E = block efficiency; Derrick load = HL(1 + 1/n + 1/(nE))
Collar length for WOB: L = WOB/(wc × BF × f), wc = collar weight per metre, f = 0.80–0.85
Triplex pump output per stroke = 3 × (π/4) d² × S × ηv ; Q = output per stroke × spm
Annular capacity (L/m) = (π/4)(D² − d²) with D, d in m, × 1000; Annular velocity AV = Q/capacity
Bottoms-up time = annular volume/Q ; Total circulation time = (string + annulus volume)/Q
Nozzle velocity v = Q/At ; Bit pressure drop Δpb = ρ v²/(2 Cd²), Cd ≈ 0.95
Bit hydraulic power = Δpb × Q ; HSI = bit hp/(π/4 × dbit²)
ECD (g/cm³) = MW + APL (bar)/(0.0981 × TVD)
Kill mud weight KMW = OMW + SIDPP/(0.0981 × TVD)
ICP = SCRP + SIDPP ; FCP = SCRP × KMW/OMW
MAASP = (ρLOT − ρmud) × 0.0981 × TVDshoe
Barlow burst (API internal yield) = 0.875 × 2 Yp t/D ; Pipe body yield = Yp × cross-sectional area
Dogleg: cos DL = cos(I2−I1) − sin I1 sin I2 [1 − cos(A2−A1)] ; DLS = DL × 30/CL (°/30 m)
Radius of curvature R (m) = 30/(DLS in rad per 30 m) = 1718.9/DLS(°/30 m)
Cost per metre C = [Cr(tr + tt + tc) + Cb]/ΔD
MSE (psi) = 4 WOB/(π d²) + 480 T × N/(d² × ROP), field units

Example 1 — Hook load, collars and derrick load. 3,000 m well: 2,800 m of 5 in, 29 lb/ft drill pipe (43.2 kg/m) and 200 m of 6½ in × 2¼ in collars (147 kg/m), mud 1.20 g/cm³, WOB 20 tf, block 25 t, 10 lines, E = 0.81.

Example 2 — Pump output, annular velocity and bottoms-up. Triplex pump, 6 in liner, 12 in stroke, ηv = 95%, 100 spm; hole 8½ in, pipe 5 in OD (ID 4.276 in), 3,000 m hole with 2,800 m pipe + 200 m collars (take 8½ × 5 in annulus throughout for an estimate).

Example 3 — Bit hydraulics. Take Q = 2,000 L/min (0.0333 m³/s), three 14/32 in nozzles, mud 1,200 kg/m³, 8½ in bit.

Example 4 — Kill sheet. TVD 3,000 m, mud 1.20 g/cm³, shoe at 2,000 m with LOT 1.65 g/cm³, SIDPP = 30 bar, SICP = 45 bar, slow-circulating-rate pressure at 40 spm = 25 bar.

Example 5 — Dogleg severity, radius and cost per metre. Station A: 15°/030°; station B: 24°/042°; course length 90 m.

CriterionRoller-cone (TCI)PDC fixed cutter
Cutting actionCrushing, gougingShearing
Moving partsCones, bearings, sealsNone
Best inHard, abrasive, interbeddedSoft to medium-hard, homogeneous
ROPModerateHigh
Life per runShorter (bearing/seal limit)Long
Torque and stick-slipLowerHigher, needs torque control
CostLowerHigher
Kill methodCirculationsShoe/casing pressureWaitingUse when
Wait and weight1LowestYes (weight-up)Barite and time available
Driller's2Higher, for longerNoSlow weight-up, immediate action needed
ConcurrentSeveralIntermediateNoDeep well, weighting up while circulating
Volumetric / lubricate-bleed0 (no circulation)Managed—Pipe off bottom or plugged
Bullheading0High, short—H₂S, no returns path, shallow influx

Where it is used