In short

Climate change is the long-term shift in temperature and weather patterns caused mainly by the build-up of greenhouse gases (GHGs) from fossil fuel burning, land-use change, agriculture and waste. Carbon accounting is the measurement, calculation and reporting of those emissions in tonnes of CO₂ equivalent (tCO₂e), for a country, a company, a product or a project. It matters because India's climate commitments under the Paris Agreement, SEBI's BRSR Core disclosures and the new Carbon Credit Trading Scheme (CCTS) turn emissions into a legally reported and tradeable quantity. The topic is examined in B.Sc/M.Sc Environmental Science, GATE Environmental Science & Engineering (XE/ES) and UGC-NET, and is used daily by sustainability analysts, ESG consultants, EHS officers and energy auditors at firms such as EY, Deloitte, KPMG, Tata Steel, Ultratech, Infosys and TERI.

Explained

The physics: greenhouse effect, forcing and feedbacks

Greenhouse gases, GWP and CO₂ equivalent

Policy architecture: global and Indian

Carbon accounting: boundaries and the three Scopes

Project accounting, offsets and net zero

Life cycle thinking and product footprints

Key points

Formulas and examples

E = AD × EF × GWP
E = emissions (kg or t CO₂e); AD = activity data (litres, kWh, kg, tonne-km); EF = emission factor (kg CO₂/unit); GWP = global warming potential (CO₂e basis, dimensionless)
CO₂e_total = Σᵢ (Mᵢ × GWPᵢ)
Mᵢ = mass of gas i (t); GWPᵢ = its 100-year GWP
Stoichiometric CO₂ from fuel: EF_CO₂ = C_content × (44/12)
44/12 = 3.667 = molar mass ratio CO₂ : C
EF from energy basis: E = Fuel quantity × NCV × EF_energy
NCV = net calorific value (TJ/Gg or MJ/kg); EF_energy = kg CO₂/TJ (IPCC default, e.g. diesel 74,100 kg CO₂/TJ)
Emission intensity = Total CO₂e / Output (tCO₂e per tonne of product, per MWh, or per ₹ crore of turnover)
Scope 2 (location-based) = Electricity purchased (MWh) × Grid EF (tCO₂/MWh)
Project credits: ER = BE − PE − LE
ER = emission reductions (tCO₂e); BE = baseline; PE = project emissions; LE = leakage
Carbon stock of biomass: C = Biomass (t dry matter) × CF; CO₂ sequestered = C × 44/12
CF = carbon fraction of dry matter, IPCC default 0.47
Carbon budget remaining ≈ (Target warming − Warming to date) / TCRE
TCRE = transient climate response to cumulative emissions, ≈ 0.45 °C per 1,000 GtCO₂

Example 1 - CO₂e of a mixed gas stream. A plant emits 5,000 t CO₂, 120 t CH₄ (fossil) and 8 t N₂O in a year. Using AR6 GWP₁₀₀:

Example 2 - Scope 1 and Scope 2 of a small factory. Annual consumption: 40,000 litres of diesel in a DG set, 18,000 kg of LPG in an oven, 1,200 MWh of purchased grid electricity. Factors: diesel 2.68 kg CO₂e/litre, LPG 2.98 kg CO₂e/kg, grid 0.75 tCO₂/MWh.

Example 3 - emission factor from first principles. Diesel has roughly 86% carbon by mass and density 0.84 kg/litre.

Example 4 - rooftop solar project: credits and money. A 500 kWp rooftop plant in Gujarat generates at a capacity utilisation factor of 17%, displacing grid power at 0.75 tCO₂/MWh.

Example 5 - intensity target under a CCTS-type compliance scheme. A cement plant emits 1.65 million tCO₂e producing 2.5 Mt of cement. The notified target intensity is 0.62 tCO₂e/t cement.

ScopeWhat it coversTypical examplesData source
1Direct, owned/controlledDG sets, boilers, process CO₂, refrigerant leaks, fleetFuel invoices, meters, CEMS
2Purchased energyGrid electricity, purchased steam/coolingUtility bills, PPAs, RECs
3Value chain (15 categories)Purchased goods, logistics, travel, product use, investmentsSupplier data, spend records, models
Kyoto ProtocolParis Agreement
TargetsBinding, Annex I onlyNDCs, all parties, self-determined
ApproachTop-downBottom-up with ratchet
India's statusNo target; CDM hostHas an NDC; net zero 2070 pledge
Market toolsCDM, JI, IETArticle 6.2 ITMOs, Article 6.4 mechanism
ReviewCompliance committeeGlobal Stocktake every 5 years
Carbon taxCap-and-trade
Fixed variablePriceQuantity of emissions
UncertaintyEmission reduction uncertainPrice uncertain (volatile)
AdministrationSimple, uses tax machineryNeeds registry, MRV, allocation
Indian exampleNone economy-wide (coal cess subsumed in GST)CCTS; earlier PAT/ESCerts, RECs

Where it is used

Interview questions

Common mistakes

Related topics

ESG and sustainability reporting · Renewable energy · Environmental impact assessment · Environmental laws in India · Environmental monitoring and analysis · Waste management rules: plastic, e-waste and biomedical

Open in the Knowledge reader →Find jobs →