Site investigation is the planned collection of information about the soil, rock and groundwater at a site so that foundations, pavements, embankments and excavations can be designed safely and economically. It covers desk study and reconnaissance, boring and sampling, in-situ and laboratory testing, and finally a soil profile with design parameters. In India it is governed mainly by IS 1892 (Code of practice for subsurface investigation for foundations) along with IS 2131, IS 2132, IS 4968, IS 4434, IS 1888 and NBC 2016 Part 6; typical investigation cost is well under 1% of project cost but it decides the success of everything above. It is examined in GATE (CE) almost every year through SPT corrections, sampler area ratio, depth of exploration and plate load test scaling, and it is the first topic in interviews at L&T, AFCONS, Tata Projects, NHAI/NHIDCL consultants, geotechnical firms and metro/railway design cells.

Explained

Purpose, stages and planning of the programme

Methods of boring and exploration

MethodSuitable soilsDepthSample qualityRemarks
Test pitAll, above water table3-6 mExcellent (block)Visual inspection; costly deeper
Hand augerCohesive, soft3-6 mDisturbedCheapest; no sand below WT
Wash boringSand, silt, soft clay30 m+Poor from cuttingsCommon for SPT holes
PercussionBoulders, gravelLargeVery poorDisturbs base; noisy
Rotary/coreAll soils and rockLargeGood to excellentBest record; needs rig and mud

Soil samples and samplers

In-situ (field) tests

TestMeasuresBest inLimitation
SPTN value, sampleSand, siltEnergy-dependent; poor in clay/gravel
CPTqc, fs, uSoft to medium soilsNo sample; stops at gravel/rock
DCPTBlows/300 mmProfiling, uniformityEmpirical, no sample
Vane shearcu, sensitivitySoft saturated clayNot for stiff/fissured/sandy clay
Plate loadqu, k, settlementSand, firm soils at shallow depthInfluence depth ≈ 2 Bp only

Geophysical methods, groundwater and rock

The bore log, report and Indian codes

Key points

Formulas and examples

Significant depth (2:1 stress spread): Δσz = q·B·L / [(B+z)(L+z)]; exploration depth z where Δσz ≈ 0.10 q
q = net applied pressure (kPa), B, L = footing width and length (m), z = depth below footing base (m)
Area ratio Ar = (D2² − D1²)/D1² × 100 (%); Inside clearance Ci = (D3 − D1)/D1 × 100; Outside clearance Co = (D2 − D4)/D4 × 100
D1 = inside dia of cutting edge, D2 = outside dia of cutting edge, D3 = inside dia of sample tube, D4 = outside dia of sample tube (mm)
Recovery ratio Rr = length of sample recovered / depth of penetration of sampler (1.0 desirable)
N60 = N · (ER/60) · CB · CS · CR ; (N1)60 = CN · N60
CN = 0.77 log10(1915/σ'v) [Peck, σ'v in kPa, for σ'v ≥ 25 kPa]; CN = √(100/σ'v) ≤ 1.7 [Liao-Whitman]
Dilatancy (saturated fine sand/silt): N' = 15 + 0.5 (N − 15) for N > 15; N' = N for N ≤ 15
φ ≈ 27.1 + 0.30 (N1)60 − 0.00054 (N1)60² (degrees, sands)
Vane shear (both ends shearing): T = π cu [ d²h/2 + d³/6 ] ; cu = T / {π [d²h/2 + d³/6]}
T = torque (N·m), d = vane diameter (m), h = vane height (m), cu in Pa. Sensitivity St = cu(undisturbed)/cu(remoulded)
Plate load - clay: Sf/Sp = Bf/Bp ; sand: Sf = Sp [ Bf(Bp + 0.3) / { Bp(Bf + 0.3) } ]² (B in m)
Plate load - ultimate capacity: clay qu,f = qu,p ; sand qu,f = qu,p × (Bf/Bp)
Modulus of subgrade reaction k = pressure / settlement (kN/m² per m, i.e. kN/m³)
RQD = (Σ lengths of core pieces ≥ 100 mm / total length of core run) × 100 ; Core recovery = (total core recovered / core run) × 100
Wenner resistivity ρ = 2π a V / I (a = electrode spacing m, V volts, I amperes, ρ in Ω·m)

Example 1 - Depth of boring for a footing. A square footing 2.5 m × 2.5 m rests 2.0 m below ground and carries a net pressure of 150 kPa. Find the required borehole depth.

Example 2 - Sampler suitability. A thin-walled tube has cutting-edge ID 72 mm and OD 74 mm; the tube ID is 73 mm and tube OD 73.5 mm. A 450 mm push recovers 430 mm of soil.

Example 3 - SPT correction and φ. At 9.0 m depth in fine saturated sand, field N = 25. γ = 18 kN/m³ throughout, water table at 3.0 m. Hammer energy ratio 60%, 65 mm borehole, standard sampler, rod length 9 m (CR ≈ 0.95).

Example 4 - Vane shear and sensitivity. Vane d = 60 mm, h = 120 mm. Peak torque 30 N·m; after 10 rapid rotations, 10 N·m.

Example 5 - Plate load test scaling. A 600 mm square plate on sand settles 12 mm at 200 kPa; the plate failed at 450 kPa. A 2.0 m square footing is proposed; permissible settlement 25 mm.

Example 6 - RQD and core recovery. A 1.5 m NX core run recovers 1.25 m of core; the intact pieces longer than 100 mm measure 120, 200, 150, 110 and 250 mm.