In short

Temperature measurement is the inference of a body's thermal state from a measurable physical change — expansion, electrical resistance, thermo-emf, or emitted radiation — since temperature itself cannot be measured by comparison with a standard mass or length. It is the most widely measured process variable in industry: roughly half of all field instruments in a refinery, power station or pharmaceutical plant are temperature sensors. Indian employers such as NTPC, BHEL, IOCL, ONGC, Tata Steel, L&T, Honeywell, Emerson, Yokogawa, ABB and Siemens test it in campus interviews through thermocouple and RTD selection, cold-junction compensation, lead-wire errors and loop calibration. In exams it carries steady marks in GATE (IN and EE), ESE and university Sensors/Instrumentation papers, usually as numerical problems on RTD resistance, thermo-emf and radiation laws.

Explained

Scales, standards and classification

Expansion thermometers

Thermocouples

Resistance thermometers (RTDs) and thermistors

Non-contact (radiation) thermometry

Installation, signal conditioning and dynamics

Key points

Formulas and examples

T(K) = t(°C) + 273.15 ; t(°F) = 1.8·t(°C) + 32 ; ΔT of 1 °C = ΔT of 1 K
Thermocouple (approx.): E = a₁ΔT + a₂ΔT² ; sensitivity (Seebeck coefficient) S = dE/dT in µV/°C
Intermediate temperatures: E(T₁,T₃) = E(T₁,T₂) + E(T₂,T₃) — used for CJC
RTD linear form: R_t = R₀(1 + αt), α in Ω/Ω/°C (0.00385 for industrial Pt)
Callendar–Van Dusen (t ≥ 0 °C): R_t = R₀[1 + A·t + B·t²], A = 3.9083×10⁻³ /°C, B = −5.775×10⁻⁷ /°C²
Thermistor (beta model): R_T = R₀·exp[β(1/T − 1/T₀)], T in kelvin, β in K (2,000–5,000 K typical)
Self-heating error ΔT = I²R·S, S = dissipation constant (°C/mW)
Stefan–Boltzmann: E = εσT⁴, σ = 5.67×10⁻⁸ W/m²K⁴, T in kelvin
Wien: λ_max·T = 2898 µm·K
Total radiation pyrometer: (T_apparent/T_true)⁴ = ε → T_true = T_apparent/ε0.25
First-order response: T(t) = T_f + (T_i − T_f)e−t/τ, τ = mc/hA (s)
4–20 mA scaling: I = 4 + 16 × (t − t_LRV)/(t_URV − t_LRV) mA

1. Pt100 resistance and the error of ignoring non-linearity. Find R at 200 °C by the linear and the CVD forms.

2. Two-wire lead error on a Pt100. 100 m run of 0.5 mm² copper, resistivity 1.72 × 10⁻⁸ Ω·m, loop length 200 m.

3. Thermocouple with cold junction not at 0 °C. A Type K couple in a furnace; the instrument (no CJC) reads 20.64 mV; the terminal block is at 35 °C. From Type K tables, E(35 °C, 0 °C) ≈ 1.40 mV.

4. Emissivity error in a total-radiation pyrometer. A pyrometer calibrated for a blackbody sights a surface at a true 1,000 °C (1,273.15 K) with ε = 0.85.

5. Sensor dynamics and 4–20 mA scaling. A thermowell-mounted RTD has τ = 12 s. The process steps from 30 °C to 150 °C. Transmitter range 0–200 °C.

FeatureThermocoupleRTD (Pt100)Thermistor (NTC)IR / pyrometer
PrincipleSeebeck emfMetal resistanceSemiconductor resistanceEmitted radiation
Range−200 to 1,700 °C−200 to 650 °C−80 to 300 °C0 to 3,000 °C+
OutputmV, lowΩ, needs excitationΩ, large changemV/digital
LinearityModerateGood (CVD correction)Poor (exponential)T⁴ law
Accuracy±1 to ±2 °C±0.1 to ±0.3 °C±0.1 to ±1 °C (narrow span)±1 to 2% of reading
SpeedFastSlower (more mass)Fast (small bead)Fastest (ms)
CostLowModerateVery lowHigh
Key weaknessCJC, special cable, driftLead resistance, self-heatingNarrow rangeEmissivity, surface only