Knowledge / Mining Engineering / Drilling and blasting

Drilling and blasting

Mining Engineering (B.E./B.Tech) · Mine operations · free study notes for exams, placements and interviews

In short

Drilling and blasting is the controlled use of a drilled hole as a container for chemical energy, so that rock is broken to a size and shape a mine's loading and crushing plant can handle. It governs the cost and productivity of almost every Indian mine - roughly 60-70% of mined rock in India is still loosened by explosives - and errors show up immediately as oversize, high-cost secondary breaking, damaged highwalls, flyrock or villagers' complaints of vibration. In exams it is a scoring area: blast design computations, cut patterns for underground drivage, explosive properties and statutory provisions are standard GATE (Mining) and university questions. In industry it is examined in interviews for Coal India subsidiaries, SCCL, NMDC, Hindustan Zinc, Tata Steel, JSW, UltraTech, NLC and explosive suppliers such as Solar Industries, IDL and Orica, and in DGMS competency examinations for Shot-firer, Blaster, Mining Mate and Manager.

Explained

Rock drilling - methods and machines

Explosives and accessories

Surface (bench) blast design

Underground drilling and blasting

Blast outcomes and environmental control

Statutory and safety framework (India)

Key points

Formulas and examples

Linear charge concentration: l = (π/4) d² ρ [d in m, ρ in kg/m³ → kg/m]; practical form l (kg/m) = 7.854 × 10⁻⁴ × d(mm)² × ρ(g/cc)
Charge per hole: Q = l × (hole length L_h − stemming T); rock per hole V₀ = B × S × H (m³)
Powder factor: PF = Q / V₀ (kg/m³) or Q / (V₀ × ρ_rock) (kg/t)
Thumb rules: B ≈ (25-40) d; S = (1.0-1.4) B; T = (0.7-1.0) B; J = 0.3 B; L_h = H/cos θ + J
Konya burden (field units): B(ft) = 3.15 × d_e(in) × (SG_explosive / SG_rock)1/3
Detonation pressure: P_d (kbar) = ρ(g/cc) × VOD²(m/s) × 10⁻⁵ / 4; borehole pressure ≈ 0.5 P_d (fully coupled)
Scaled distance: SD = D / √Q_max [D = distance, m; Q_max = max charge per delay, kg]
Vibration: PPV = K (SD)−B [PPV in mm/s; K and B are site constants from a regression of monitored blasts]
Kuznetsov / Kuz-Ram: x₅₀ = A (V₀/Q)0.8 × Q1/6 × (115/E)19/20 [x₅₀ mean size in cm, A = rock factor 7-13, E = relative weight strength, ANFO = 100]
Uniformity index: n = (2.2 − 14B/d) × √[(1 + S/B)/2] × (1 − W/B) × (L_charge/H) [B, S, W in m; d in mm]
Rosin-Rammler: R = exp[−0.693 (x/x₅₀)n] = fraction retained on size x

Example 1 - Bench blast design (limestone quarry, 115 mm DTH holes, bulk ANFO 0.85 g/cc, rock density 2.6 t/m³, bench 10 m).

Example 2 - Fragmentation by Kuz-Ram (same blast, A = 7 for medium jointed rock, E = 100 for ANFO).

Example 3 - Vibration check and blast size. Nearest village house is 300 m away; site constants K = 1,140, B = 1.6; permissible PPV at the structure 5 mm/s (low-frequency case).

Example 4 - Underground drivage round. Face 4.0 m × 3.0 m, holes 3.0 m deep, 45 charged holes plus 1 relief hole, pull 2.7 m, 1.1 kg emulsion cartridges per metre charged over 2.4 m per hole.

Example 5 - Drill-and-blast cost per tonne (indicative rates; actual rates vary by contract, state and year).

ItemRatePer hole (364 t)₹/tonne
Drilling, 11 m₹120/m₹1,3203.63
Bulk ANFO, 75 kg₹45/kg₹3,3759.27
Cast booster + Nonel DTH + surface connector₹150/hole₹1500.41
Charging, stemming, supervision—₹2000.55
Total₹5,04513.86
ComparisonANFOEmulsion (bulk/SMS)NG gelatine
Density (g/cc)0.80-0.851.10-1.301.4-1.5
VOD (m/s)3,000-3,5004,500-5,5005,500-6,500
Water resistanceNilExcellentExcellent
CostLowestModerateHighest
Typical useDry opencast holesWet holes, all opencast, undergroundSmall-diameter, special work

Where it is used

Interview questions

Common mistakes