Textile costing

Textile Technology (B.E./B.Tech) · Quality and industry · free study notes for exams, placements and interviews

In short

Textile costing is the systematic build-up of the cost of a fibre, yarn, fabric or garment from its cost elements - material, labour and overheads - so that a selling price, a quotation or a make-or-buy decision can be defended with numbers. It matters because textiles is a low-margin, high-volume business where raw material alone is 55-70% of yarn cost and a paisa per metre decides whether an export order is won. It is examined in university papers on "Textile Mill Management / Costing and Economics", in GATE-TF style numericals on production and waste, and in placement rounds at spinning mills, composite mills, processing houses and export houses (Arvind, Vardhman, Trident, Welspun, KPR, Shahi, Raymond, Alok). On the job it is the daily language of merchandisers, production planners, costing officers and cost accountants.

Explained

Cost elements and the cost sheet

Costing methods and systems used in textiles

Spinning (yarn) costing

Weaving, knitting and processing costing

Garment and export costing

Decision tools and statutory framework

Key points

Formulas and examples

Cotton cost (₹/kg) = price per candy ÷ 355.62 [1 candy = 355.62 kg; 1 Indian bale = 170 kg]
Raw cotton per kg yarn = 1 / (1 − total waste fraction); Yarn realisation % = yarn out ÷ cotton fed × 100
Net material cost per kg yarn = (mixing cost ÷ (1 − waste)) − (saleable waste kg × waste rate ₹/kg)
Ring-frame output (kg/spindle/8 h shift) = n × η / (138.9 × TPI × Ne)
n = spindle speed rpm, η = efficiency (fraction), TPI = twists per inch, Ne = English count (hanks of 840 yd per lb)
Count conversions: tex = 590.5/Ne; denier = 5315/Ne; Nm = 1.693 × Ne
Loom output (m/h) = ppm × 60 × η / (PPI × 39.37) [ppm = picks per minute; 39.37 inch = 1 m]
Fabric GSM = 23.25 × [EPI × (1+c_w)/Ne_warp + PPI × (1+c_f)/Ne_weft] [c = crimp fraction]
Fabric weight per metre (kg) = GSM × width (m) / 1000; Yarn cost per metre = that weight × yarn ₹/kg × (1 + weaving waste)
Machine hour rate = (depreciation + interest + power + labour + repairs + allocated overheads per year) ÷ productive machine hours per year
Cost per minute = total factory cost per month ÷ (operators × working minutes × line efficiency)
CM cost = SAM × cost per minute; FOB = (fabric + trims + CM) × (1 + rejection%) + overheads + profit
Contribution = sales − variable cost; BEP (units) = fixed cost ÷ contribution per unit; P/V ratio = contribution ÷ sales
Material price variance = (SP − AP) × AQ; Material usage variance = (SQ − AQ) × SP [S = standard, A = actual]

Example 1 - cost sheet for 1 kg of 40s carded ring yarn Cotton at ₹62,000/candy → 62,000 ÷ 355.62 = ₹174.34/kg. Total waste 12% (of which 2% invisible), saleable waste sells at ₹55/kg.

Example 2 - production and the count effect 40s, 16,000 rpm, TPI 24, efficiency 95%: output = (16,000 × 0.95) ÷ (138.9 × 24 × 40) = 15,200 ÷ 133,344 = 0.114 kg/spindle/shift (114 g). A 25,000-spindle mill on 3 shifts = 0.114 × 25,000 × 3 = 8,550 kg/day ≈ 8.55 t. At 30 running days, 256.5 t/month. If the same mill spins 80s, output per spindle roughly halves, so the ₹95/kg conversion cost in Example 1 would rise to about ₹190/kg - which is why fine-count mills live on conversion efficiency, not cotton price.

Example 3 - 40×40/120×80 plain shirting, 120 cm width

Example 4 - cost per minute and shirt FOB 500 operators × 26 days × 480 min = 62,40,000 available minutes; at 55% efficiency = 34,32,000 earned minutes. Factory cost ₹1.20 crore/month → ₹3.50 per minute. A shirt: marker average 1.55 m + 7% wastage = 1.6585 m × ₹72.51 = ₹120.24 fabric; trims ₹25.00; SAM 22 min × ₹3.50 = ₹77.00 CM. Sub-total ₹222.24 × 1.02 (2% rejection) = ₹226.68; profit 12% = ₹27.20 → FOB ₹253.88, about USD 2.88 at ₹88/USD (rate must be the hedged or booked rate). RoSCTL/drawback is credited separately as income.

Example 5 - break-even and variance Processing house: fixed cost ₹40,00,000/month, selling price ₹28/m, variable cost ₹18/m → contribution ₹10/m.

Cost blockSpinning (₹/kg yarn)Weaving (₹/m grey)Garment (₹/shirt FOB)
Material191.86 (59%)45.35 (78%)145.24 fabric + trims (57%)
Conversion/CM95.00 (29%)13.16 (22%)77.00 (30%)
Selling, rejection, profit38.59included downstream31.64
Total325.4558.51253.88

Where it is used

Interview questions

Common mistakes