Knowledge / Mechanical Engineering / Work study and ergonomics

Work study and ergonomics

Mechanical Engineering (B.E./B.Tech) · Industrial engineering · free study notes for exams, placements and interviews

In short

Work study is the systematic examination of how work is done, in order to improve the method (method study) and to establish how long the job should take (work measurement). Ergonomics (human factors) fits the job, the machine and the workplace to the worker's body and mind, rather than forcing the worker to adapt. Together they fix the industrial engineer's two core outputs: a standard method and a standard time, which then feed line balancing, capacity planning, incentive wages, costing and labour budgets. The topic is examined in GATE (ME and PI), every university Industrial Engineering paper, and asked in interviews at Maruti Suzuki, Tata Motors, Bajaj, Hero, TVS, Ashok Leyland, L&T, Titan, Amazon, Flipkart and Delhivery for IE/plant/operations roles.

Explained

Productivity, work study and work content

Method study - the eight steps and recording tools

  1. SELECT the job - high labour content, bottleneck, costly, unsafe, or high scrap.
  2. RECORD the present method using charts and diagrams (below).
  3. EXAMINE critically with the questioning technique: purpose (what, why), place (where), sequence (when), person (who), means (how) - each asked as *what is done / why / what else could be done / what should be done*.
  4. DEVELOP the improved method (ELIMINATE, COMBINE, REARRANGE, SIMPLIFY - the ECRS rule; eliminate first, it pays most).
  5. EVALUATE alternatives on cost, safety, quality, feasibility.
  6. DEFINE the new method in a written standard practice sheet.
  7. INSTALL - train operators, get supervisor and union acceptance.
  8. MAINTAIN - audit periodically so the method does not slip back.

(Several textbooks compress this to six steps: SREDIM - Select, Record, Examine, Develop, Install, Maintain.)

Motion study, therbligs and motion economy

Work measurement - techniques and time study

Ergonomics - the man-machine system

Comparing and applying the outputs

Key points

Formulas and examples

Productivity = Output / Input; Labour productivity = Units produced / Man-hours
Observed (average) time OT = Σ observed cycle times / number of cycles
Normal (basic) time NT = OT × (Rating % / 100)
Standard time ST = NT × (1 + total allowance fraction) [allowance on normal time - the common convention]
ST = NT / (1 − allowance fraction) [when allowance is expressed as a fraction of the total shift time]
Standard output per shift = Available time / ST
Number of cycles for time study n = (Z·s / (E·x̄))² ; Z = 1.96 for 95% confidence, s = standard deviation of cycle times, x̄ = mean, E = permitted relative error
Work sampling sample size n = Z²·p(1−p)/e² (absolute error e) or n = Z²(1−p)/(p·r²) (relative error r)
Work sampling standard time ST = [(Total study time × % working × Rating) / Units produced] × (1 + allowance)
MTM: time in seconds = TMU × 0.036 (1 TMU = 0.00001 hour)
Machine interference / machines per operator n = (l + m) / (l + w); l = loading-unloading time, m = machine running time, w = walking/idle attention time
NIOSH: RWL = LC × HM × VM × DM × AM × FM × CM; LC = 23 kg load constant; Lifting Index LI = Load weight / RWL (LI > 1 means increased risk)
Cycle time (line) = Available time / Demand; Balance efficiency = Σ task times / (Number of stations × Cycle time)

Example 1 - Normal time, standard time and output. A stopwatch study of a drilling job gives cycle times 0.52, 0.55, 0.50, 0.58, 0.54, 0.51 min. The operator is rated at 110% (BSI scale). Allowances: personal 5%, basic fatigue 4%, variable fatigue 6%, contingency 3%.

Example 2 - Number of cycles to observe. From a pilot study of 10 cycles, mean x̄ = 1.80 min, standard deviation s = 0.21 min. Required: 95% confidence, ±5% relative accuracy.

Example 3 - Work sampling. A 40-hour work-sampling study of a packing section (5 workers) takes 1,200 random observations; 960 show productive work, 240 show idle/delay. Output in the period = 7,200 cartons. Average rating during productive observations = 95%. Allowances = 15%.

Example 4 - Man-machine chart and machine assignment. An operator loads and unloads a CNC machine in 1.5 min (l), the machine then runs unattended for 6.0 min (m), and walking between machines takes 0.5 min (w).

Example 5 - NIOSH lifting equation. A worker lifts 12 kg boxes from a pallet. Multipliers from the study: HM = 0.80, VM = 0.93, DM = 0.88, AM = 0.90 (30° twist), FM = 0.75 (1 lift/min over a full shift), CM = 0.95 (fair coupling, low lift).

TechniqueBest forNeeds rating?Cost/effortOutput detail
Time study (stopwatch)Short-cycle repetitive manual workYesMediumElement-wise times
Work samplingLong-cycle, group, indirect workOnly for setting standard timesLowActivity proportions
PMTS (MTM, MOST)Short-cycle assembly, pre-productionNoHigh (training)Motion-level times
Synthesis / standard dataFamilies of similar jobsNo (built in)Low once builtElement times
Analytical estimatingMaintenance, one-off jobsPartlyLowWhole-job estimate
Method studyWork measurement
Question answeredHow should the job be done?How long should it take?
Main toolsProcess charts, diagrams, SIMO, therbligsStopwatch, work sampling, PMTS
OutputStandard method / practice sheetStandard time
DoneFirstAfter the method is settled
ResistanceModerateHigh (linked to wages)

Where it is used

Interview questions

Common mistakes

Related topics

Production planning and control · Lean manufacturing and Six Sigma · Plant layout and material handling · Industrial safety and maintenance · Operations research basics · Engineering economics and costing