Knowledge / Mining Engineering / Underground coal mining

Underground coal mining

Mining Engineering (B.E./B.Tech) · Mining methods · free study notes for exams, placements and interviews

In short

Underground coal mining wins coal from seams too deep or too thick-overburden to strip from surface, through shafts or inclines, using either bord and pillar (a grid of galleries leaving coal pillars, later extracted) or longwall (a long face retreated in one pass with powered supports while the roof caves behind). India works over 95% of its underground coal by bord and pillar, mostly semi-mechanised with SDL/LHD, with continuous miners and powered support longwalls at a growing number of faces. The subject is governed by the Coal Mines Regulations, 2017 under DGMS, and is examined heavily in GATE (Mining), university Mining Methods papers and in the Mining Sirdar/Overman/Manager certificate examinations. Employers: Coal India subsidiaries (ECL, BCCL, CCL, NCL, WCL, SECL, MCL), SCCL, NLC India, Tata Steel and JSW collieries, and contractors such as Thriveni, AMR and Sainik Mining.

Explained

Access, layout and terminology

Bord and pillar — development and depillaring

  1. Development: drive galleries on two near-perpendicular sets to form square/rectangular pillars. Recovery at this stage is only 20–30%.
  2. Cycle (conventional/semi-mechanised): drilling (jack hammer / UDM) → charging with permitted explosives (grades P1/P3/P5, the grade set by the degree of gassiness) and shotfiring → ventilating and dressing → loading by SDL (side discharge loader) or LHD into tubs/chain conveyor → supporting the roof per the Systematic Support Rules.
  3. Continuous miner (CM): a drum-type cutter head wins and loads in one operation; coal goes by shuttle car or flexible conveyor train to a feeder breaker and belt. Bolter-miners install roof bolts on the face. India's first CM was at Anjan Hill (SECL, 2002); SCCL's VK-7 and GDK units followed; CM units routinely give 30,000–80,000 t/month against 3,000–6,000 t/month for an SDL section.
  4. Depillaring (pillar extraction): pillars are split and then sliced from the boundary towards the shaft, keeping a straight or diagonal line of extraction, so the goaf is always behind the men.
    • With caving: roof is allowed to collapse; cheap, fast, causes subsidence; needs control of air blast at a main fall (break the roof in smaller, regular falls, keep goaf edge supported with chocks/props or mobile roof supports).
    • With sand stowing: hydraulically transported sand fills the goaf; recovery up to ~85–90%, subsidence reduced to a few per cent of thickness, fire risk cut — but costly and needs sand and water.
    • Partial extraction: pillars reduced to a safe stook size where surface features must be protected.
  5. Advantages: flexible, low capital, suits disturbed/faulted seams, allows early production from development. Limits: low recovery, high manpower per tonne, coal locked in pillars, standing-support intensive, slow.

Longwall mining

Thick seam methods (an Indian specialty — many seams are 6–30 m)

Strata control and support

Hazards specific to coal, and the law

Key points

Formulas and examples

Vertical (virgin) stress σv = γ H ≈ 0.025 H MPa (γ ≈ 0.025 MPa/m for coal measure rocks, H = depth in m)
Tributary area pillar stress (square pillars) σp = σv × [(w + B)/w]² (w = pillar width, B = gallery width, m)
Sheorey (CMRI) pillar strength S = 0.27 σc h−0.36 + (H/250 + 1)(w/h − 1) MPa (σc = UCS of 25 mm cube, MPa; h = working height, m; H = depth, m; w = pillar width, m)
Obert–Duvall strength Sp = S1 (0.778 + 0.222 w/h), S1 = strength of a cubical specimen
Safety factor SF = S / σp (dimensionless)
Percentage extraction on development (square pillars) = 1 − [w/(w + B)]² , expressed as %
Longwall output per cut = L × d × h × ρ × R (L = face length m, d = web m, h = cutting height m, ρ = in-situ density t/m³, R = recovery)
Air quantity to dilute methane Q = q / c (q = methane emission m³/min, c = permissible concentration as a fraction); statutory minimum also 6 m³/min per person at any working place
Specific methane emission q = (m³ of CH₄ per day) / (tonnes produced per day), m³/t
Maximum subsidence Smax = a × m (a = subsidence factor, m = extracted thickness); draw distance = H tan θ (θ = angle of draw)

Example 1 — pillar design and safety factor. Depth 300 m, gallery 4.2 m wide, working height 3.0 m, pillar centres 37.5 m, coal UCS (25 mm cube) 25 MPa.

Example 2 — percentage extraction. Same layout: extraction = 1 − (33.3/37.5)² = 1 − 0.789 = 21.1% on development. If depillaring with caving later recovers 80% of the remaining 78.9%, overall recovery = 21.1 + 0.80 × 78.9 = 84.2%.

Example 3 — longwall face output. Face 150 m, web 0.8 m, height 3.0 m, ρ = 1.5 t/m³, recovery 95%, 10 web cuts per day.

Example 4 — ventilation for a gassy seam. A Degree III panel produces 3,000 t/day with specific emission 15 m³/t; permissible methane in the district return 1.25%.

Example 5 — subsidence. Panel 200 m wide, extracted 3.0 m thick at 200 m depth, caving, subsidence factor 0.6, angle of draw 35°.

FeatureBord and pillarLongwall
Recovery50–85% (higher with stowing)85–95%
Capital costLow to moderateVery high
Output per face3,000–80,000 t/month1–3 lakh t/month
Geological toleranceHigh — works faulted, variable seamsLow — needs uniform, undisturbed panel
SupportStanding + bolting, labour intensiveSelf-advancing powered shields
SubsidenceDelayed, irregular (caving) or small (stowing)Immediate, predictable
Fire/gas riskGoaf leakage, heating in pillarsGoaf gas managed by planned ventilation
Indian shareOver 95% of UG facesA handful of faces

Where it is used

Interview questions

Common mistakes